Typ 05: 2ST24LZ-63 timber bank (tandem)

equipment
- Lower construction, lower core point position
- Light-weight steel construction frame
- Rigid-axle for dual-tires
- Longitudinal carrier gaps with bulb plates
- Lateral start-security
- 1 stop-block
- Side lamp
additional equipment
Optional extra facilities:
- Disc-breaks
- Quantity and positions of stake/-case longitudinal
- Type of stake/-case
- Tie-down systems
- Drag-gab
technical specifications) | |
---|---|
overall weight tech.: | 24.000 |
overall weight (allowed): | 18.000 |
overall length: | 6.300 |
axes: | 2 x 12 t |
tires: | 275/70 R 22,5 |
your contact
